মেনু নির্বাচন করুন

টেন্ডার কর্নার

শিরোনাম প্রকাশের তারিখ আর্কাইভের তারিখ
Construction of Main and Sub distribution pipe lines at Pabna Pourashava under 37 District Town Water Supply Project During the FY 2017-18 2017-12-30
Installation of 27 nos 75mm dia Water point with Submersible Pump, Water Collection Point & OHT at different Primary School of different Upazila in Pabna District under PEDP-3 Project during the FY 2017-2018. (Group No-01) 2018-03-27
Installation of Submersible Pump and constructing Water Collection Basin with Over Head Tank OHT in existing 100 Nos Tube well at different Primary School Within Pabna District under Third Primary Education Development Program PEDP-3 during FY 2017-18. Group-1 2018-03-25
Installation of Submersible Pump and constructing Water Collection Basin with Over Head Tank OHT in existing 100 Nos Tube well at different Primary School Within Pabna District under Third Primary Education Development Program PEDP-3 during FY 2017-18. Group-2 2018-03-25
Installation of 27 nos 75mm dia Water point with Submersible Pump Water Collection Point & OHT at different Primary School of different Upazila in Pabna District under PEDP-3 Project during the FY 2017-2018. Group No-01 2018-03-22
Installation of 21 nos 75mm x 38mm dia DTW with Submersible Pump Water Collection Point & OHT at different Primary School of different Upazila in Pabna District under PEDP-3 Project during the FY 2017-2018. Group No-03 2018-03-22
WB-GPS-0025 Construction of 6 Nos. RCC WASH BlockMTBoys and FTGirls including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works for each at 6 nos different primary school within Pabna District under Need Based Infrastructure Development of Government Primary Schools Phase-i. 2018-03-19

Share with :
Facebook Twitter